Sign up for the 1930s-era cycleways project

Between 1934 and 1940 Britain’s Ministry of Transport paid local authorities to install cycle tracks. As seen and heard on the BBC, ninety or so schemes were built, resulting in perhaps as many as 500 miles of cycle tracks, some of them protected with curbs. The great majority were built – 9-ft wide and both sides of the roads – next …